BWNS

Bahá’í World News Service

|

Official news source of the worldwide Bahá’í community

Shrine of ‘Abdu’l-Bahá: Concrete structure of the Shrine is now complete

August 30, 2023
Share
Share this page:
FacebookTwitterWhatsAppTelegramLinkedinBaiduBalatarinOdnoklassnikiRedditWeiboVKPinterestCopy Link

Back to Story

7 of 22
The sun sets on Sunday evening with work fully under way to cast the roof structure. The base of the east berm is used as a staging area for two of the concrete pumps.

The sun sets on Sunday evening with work fully under way to cast the roof structure. The base of the east berm is used as a staging area for two of the concrete pumps.

Download

Highest resolution

Before downloading please refer to the Terms of use.

  • BWNS Home
  • Shrine of ‘Abdu’l-Bahá: Concrete structure of the Shrine is now complete
  • Slideshow
  • Contact 
  • Legal 
  • Privacy

The Bahá’í Faith

© 2023 Bahá'í International Community

  • BWNS Home
  • Video
  • Podcast
  • Story Archive
  • Media Information
  • Subscribe
  • All sites

English

Français

Español

فارسی

Русский

  • BWNS
  • BWNS Home
  • Video
  • Podcast
  • Story Archive
  • Media Information
  • Subscribe