Following the completion of the steel structure, the roof and ceiling timber framing were installed, providing additional strength to the central edifice and the framework for its stainless steel roof. Next, a series of timber battens were installed on top of the folding roof to prepare the central edifice for its ‘natengora’ thatch roofing, made from the leaves of a locally available palm tree.